33 | P a g e
Goals: Habitat, Access, Prevention
Tasks:
a. Remove sediment from retention structures.
b. Add a fishing pier near the west parking lot and fix the current pier on the east
side.
c. Chemical renovation of fish population to improve sportfish populations if draw
down occurs for dam maintenance.
Ownership: Lower Platte South NRD
Potential Partners: Lower Platte South NRD, NGPC Wildlife Division.
Wilson Creek 2X WMA (Otoe County)
Wilson Creek 2X was built in 1972 and is located about 4 miles northwest of Dunbar. This
15-acre reservoir offers a valuable fishery in an area with limited public access, but it faces
several issues. The lake is generally shallow, has poor angler and boating access, and suffers
from dense aquatic vegetation. Additionally, the access road to the WMA has a history of
washouts, which can limit lake access. This project aims to address these challenges by
removing sediment, improving angler access, replacing the boat launch facilities and
repairing the access road.
Goals: Habitat, Access
Tasks:
a. Targeted sediment removal to restore storage capacity and enhance angler
access areas.
b. Replace boat ramp facilities to improve access for launching.
c. Fish habitat enhancements with artificial structures and cedar trees.
d. Improve shoreline access with bump outs, jetties and docks.
e. Access road improvements to address washout problems.
Ownership: NGPC
Potential Partners: NGPC Wildlife Division